RG66001652_REV.02
12
LCW - LCR
Installation
General rules
- When installing or servicing the chiller, you must strictly follow the rules provided in this manual, comply
with the directions on the units and take all such precautions as are necessary.
- The fluids under pressure in the cooling circuit and the presence of electrical components may cause
hazardous situations during installation and maintenance work.
All work on the unit must be carried out by qualified personnel trained to do their
job in observance of current laws and regulations.
- Failure to comply with the rules provided in this manual or any modification made to the unit without
prior authorisation will result in the immediate invalidation of the warranty.
Warning: Before performing any kind of work on the unit, make sure it has been
disconnected from the power supply.
Inspection/Conveyance/Siting
Inspection on receipt
On receiving the unit, check that it is perfectly intact: the machine left the factory in perfect conditions;
immediately report any signs of damage to the carrier and note them on the Delivery Slip before signing
it.
GALLETTI S.p.A. or its Agent must be promptly notified of the entity of the damage. The Customer must
submit a written report describing every significant sign of damage.
Lifting and Conveyance
While the unit is being unloaded and positioned, utmost care must be taken to avoid abrupt or violent
manoeuvres. The unit must be handled carefully and gently: avoid using machine components as
anchorages when lifting or moving it.
The unit must be lifted using the holes provided on the base and a lifting beam to prevent the unit from
being deformed due to axial strains during lifting.
Warning: In all lifting operations make sure that the unit is securely anchored in order to
prevent accidental falls or overturning.