background image

Publish changes

Select 

Publish

 to publish your configuration to the controller.

Commission site 

1.  Select 

Commission site

You will then be requested to complete the system tests, marking each item test result as 
"Passed" before you can activate your site.  

Note: This step in the installation process is where the technician will need to walk-test 
the site to check wiring and configuration is all correct.

2.  Before the site is activated the Commissioning Report can be viewed or downloaded as 

required.  This document can be provided to the Key Account Holder as evidence that the 
site has been commissioned and is functioning correctly.  

Activate site 

Select 

Activate site

Once the site is activated, the Key Account Holder (you) will receive an email invitation to 
download the Customer App on your phone, to complete the registration. Open the email from 
your phone and follow the instructions. 

You should now be able to interact with your system using the Customer App on your phone.  

Summary of Contents for SMB Demonstration Suitcase

Page 1: ...Gallagher SMB Demonstration Suitcase User Guide Gallagher SMB Demonstration Suitcase NZ AU C500900 Edition 1 December 2021...

Page 2: ...993 1 x Power Supply 3 5A C200340 1 x I O Board Mounting Plate C200001 1 x Permaconn Kit NZ C500609 or AU C500610 1 x T15 Reader C500481 2 x SMB Key Tags C500470 C500471 Switches to allow for simulati...

Page 3: ...is open Request to Exit Switch position 0 Door REX is closed request to exit Switch position I Door REX is open normal Inputs and outputs The hardware within the suitcase is pre wired to support a fi...

Page 4: ...tch Office 3600 PIR User You will be required to use your mobile phone to demonstrate the Customer App You can invite users to your fictional site and allocate roles so they can experience the product...

Page 5: ...og into the Atlas Portal https admin permaconn com 2 Select the Fleet tab then Activate The Device Activation screen displays 3 Enter the PM54 serial number located on the white label The PM 54v2 Acti...

Page 6: ...ription fees Gallagher will audit the number of demo sites per partner 4 Tick the Site uses tags checkbox 5 Complete the Key Account Holder details then select OK Field Description First Name Enter Jo...

Page 7: ...nput 10 Rename to Door Lock Sensor Select OK 3 Select Input 11 Rename to Door Request to Exit Select OK 4 Select Input 13 Rename to Office PIR Select OK 5 Select Input 14 Rename to Roller Door Reed Sw...

Page 8: ...gn Outputs and select Siren as an Alarm Output The siren will activate when an alarm is triggered 4 Select OK 5 Select Add New Select Area The New Area lightbox displays 6 Rename to Store Room 7 Selec...

Page 9: ...en Sensor input 5 From the Lock Sensor drop down select the Door Lock Sensor input 6 From the Area drop down select the Office area 7 From the Request to Exit drop down select the Door Request to Exit...

Page 10: ...s all correct 2 Before the site is activated the Commissioning Report can be viewed or downloaded as required This document can be provided to the Key Account Holder as evidence that the site has been...

Page 11: ...he site The Door Unlock Relay will illuminate Remote unlock Using the Customer App unlock the door This is an unlock override that will unlock the door until the next schedule change Door schedule Exp...

Page 12: ...able the phone to be presented from a greater distance for access decisions This may be useful for outdoor mounted reader locations vehicles Likewise increasing the Local Arming Range will enable the...

Reviews: