21-11-1025
Section 5 - 1
5.0 OPERATION
A. Check that Cylinders are emptied and drained of water.
B. Place a Probe into each Cylinder that is going to be dried, and align under each
individual Manifold Outlet. Connect each Probe by pushing up into a Quick
Connect on the Upper Body.
NOTE:
Avoid bending or otherwise damaging the Probes.
C. When cylinders have been loaded, flip the Power Switch up, to the ON position.
D. The display on the PID Controller will read the last set temperature. For example,
see Figure 2, below. The temperature to achieve (Goal Temperature), shown
here is 250° F. Each time the HDD is powered up, the display will read the
temperature that was set to achieve when the machine was turned off.
Figure 2, HDD Controller
E. The Current Running Temperature of Air Flow, as measured in the Main Body
Heat Tube. Shown here as 242°F. This will be an approximate of the temperature
of air flow through the Probes.
F. To change the desired temperature, simply press the Arrow Up
or Arrow
Down
Buttons. Increments will change by 1°F by pressing once. By pressing
and holding the Up or Down Buttons, increments will begin changing by 10° F.
Summary of Contents for HDD-8RB
Page 11: ...Wiring B 21 11 1025 Ground Wire L1 L2 L3...
Page 12: ...21 11 1025 Schematic...