11
G8-09-11-2018
Pan Switch
The Pan Switch Assembly connects as shown. Mount each rocker
approximately 6” from the edge of the unit on the subfloor beams. Then
you will drill an 11/16” hole in the beam and install the cable gland as
shown. Next, route travel wire from the switches, through the hole you
drilled, up over the brace (midway point) and finally to the control box.