ENGLISH - 3
ENGLISH
www.gaggenau.com/us
TOOLS & MATERIALS NEEDED
Tools Needed for Installation
Additional materials may be required to comply with local codes.
Figure 2
Materials Needed
Hot Water Supply Line
- Minimum 3/8”
O.D. copper tubing or metal braided
dishwasher supply line.
Shut-off valve and fittings for hot water
supply line.
90° elbow with 3/8” N.P.T. external threads
on one end and sized to fit your water
supply line on the other end.
UL listed conduit connector or strain relief.
3 twist-on wire connectors for 16 AWG
wire.
Teflon tape or other pipe thread compound
which help seal plumbing connections.
Electric Connection
- 2 conductor, 1 ground
insulated electrical supply cable (30” or
sufficient length for
your
installation).
4
5
6
3
TAPE
2
1
7
Figure 1
Hole saw or 1 hole cutter
Level
Torx screwdriver, #20
Phillips screwdriver (#2)
Slotted screwdriver (#2)
Adjustable wrench,
(size med., 2 reqd.)
Wire stripper
Wire Cutter
Pipe wrench, 2 reqd.
Electric Drill
Tape Measure
Hammer
osch