4
Turn the carton upside down to allow the heater to stand on its feet and remove the carton. Check that it is the correct model
and that it is in good conditions.
Check that all parts have been delivered and are intact.
-
1
Ecombi SSH heater casing.
-
1
bag containing
2
screws and
2
dowels.
-
2
supporting feet.
-
This guide.
-
1 superior fixing fitting.
-
2 lateral fixing fitting.
The casing and storage bricks are supplied separately. Check the supplied bricks packages correspond to the ones
indicated on the heater carton.
The heater operation is not affected if bricks with minor damage are used.
3. - Take off the front panel by removing the two screws located at the bottom. Fix the lateral fittings to the metal structure by
using the appropriate screws.
4. - Place ECOMBI in your selected installation area. Use the heater fixing holes as a template and mark the wall through the
fixing holes with a pencil. Drill the required holes into the wall. Place the dowels and screws into the holes before the appliance
installation but do not fasten them tightly.
5. Attach ECOMBI to the dowels with the crews. IT MUST NOT BE HUNG ON THE SCREWS; these are used only to prevent
the device from overturning and not to support it. If there is any doubt concerning the wall strength, consult the corresponding
construction specialist. The appliances are heavy; it is the installer responsibility the correct installation and wall support of these
devices to prevent them from overturning.
6. - Connect the heater using the wiring diagram included at the end of this manual. Tighten properly the connection block
screws. Do not leave any remaining wire inside the heater.
WARNING
Touching live connections can cause serious personal injury.
i
i