background image

 

© 2012 G Force Automatic Gates All Rights Reserved 

Black / Blue

 wires to 

black

 

Negative battery Terminal / 
Double piggy back spade 
connectors for solar power or 
single spade connectors for 
transformer power.  

Red

 wires to 

Red

 Positive 

Battery Terminal / Double piggy 
back spade connectors for solar 
power or single spade connectors 
for transformer power.  

DSG DC2 GATE MOTOR 

INSTALLATION AND SET UP 

INSTRUCTIONS 

Refer to the “

DC 2 Circuit Board” ” 

data sheet included with this manual or to any reference 

notes or photos and fit the wires back into the correct terminal locations on the control board. 
 
Fit the battery on its end into the battery space on the drive assembly as shown below.

 

Connecting the Circuit Board and Fitting the Battery  

It is recommended that the battery be connected first during this stage of the installation. The 
primary power source can be connected after all the necessary set-up procedures and 
adjustments are made. Refer to the “

DC 2 Circuit Board” 

data sheet included with this manual 

and locate the battery connection terminals on the circuit board. Ensure the battery wires are 
correctly connected to the correct terminals on the circuit board. Connect the battery wires to the 
battery terminals on the battery. Note the polarity (

Red

 positive wires to 

Red

 battery terminal, 

Black / Blue

 Negative wires to 

Black

 battery terminal). The board should now be powered 

and great care should be taken to avoid shorting out or otherwise damaging the circuit board. 

Battery Wires 

Care should be taken as there are moving components inside the gate 

motor that may cause damage or personal injury.  

ALWAYS TURN THE POWER OFF AND DISCONNECT THE BATTERY 

BEFORE MAKING ANY WIRING CONNECTIONS

 

Drive 
Assembly 

Battery 

DIY Automatic Gate Kits

 

PH 1800 111 930 

[email protected] 

www.gforceautogates.com.au

  

Mounting 
Cradle 

Summary of Contents for DSG 5 DC2

Page 1: ...l DSG 5 DC2 Double Swing Gate Motor Kit Solar Powered and 12V Low Voltage July 2019 Installation and Set Up Instructions Unit 27 49 Corporate Boulevard Bayswater Vic 3153 Phone 1800 111 930 Email info...

Page 2: ...ng the cover turn off and or disconnect the power to the gate motor If you are unable to do this then we strongly recommend you call an electrician Care should be taken as there are moving components...

Page 3: ...te We recommend 1 5mm twin active lighting cable for power supply wiring and 1mm figure 8 wire for wiring push buttons and other auxiliary items Place the gate motors on a suitable work bench Unpack t...

Page 4: ...ormer Terminals Push Button Wire in Receiver Terminals Connect wires to OSC and COM PE Beam Terminals Connect wires to PEB and COM 12V Power Out Terminals V positive terminal 0V Negative terminal Moto...

Page 5: ...motor gear has meshed with the drive gear Fully tighten the Internal Release Bolt and check the gears are engaged External Manual Release Swing Arm Drive Arm Swing Arm Use a 19 mm spanner to undo the...

Page 6: ...ill need to open first therefore close last Typically one or other of the gates may be fitted with a lip or tab to help align the gates when closed The lip or tab may be fitted to the leading edge of...

Page 7: ...board should now be powered and great care should be taken to avoid shorting out or otherwise damaging the circuit board WARNING Care should be taken as there are moving components inside the gate mo...

Page 8: ...n disconnect all power Refer to the DC2 Circuit Board data sheet included with this manual and locate the Motor M1 and Motor M2 terminals on the circuit board Identify which motor is going in the wron...

Page 9: ...d circuit board from the gate motor mounting cradle by undoing the 4 nuts underneath the motor holding the drive assembly in the mounting cradle and remove the drive assembly and circuit board from th...

Page 10: ...er tab The spacer tabs allow the lip of the motor cover to be correctly fitted over the mounting cradle and drive assembly Firmly attach the mounting cradle to the post and check that the cradle is le...

Page 11: ...rd gate bracket touches the gate Measure approximately 40mm back towards the gate motor from the marked position and attach the standard gate bracket to the gate at this point Tighten the two swing ar...

Page 12: ...nstallation The primary power source can be connected after all the necessary set up procedures and adjustments are made Refer to the DC 2 Circuit Board data sheet included with this manual and locate...

Page 13: ...rrect cam until it clicks the corresponding limit switch see above Re tighten the cams Repeat for second motor Engage the Internal Release see page 5 CAUTION The gates will now open close when the gat...

Page 14: ...oard This adjustment controls the motor torque and obstruction sensing of both gate motors The motors need to have enough torque force to fully open and close the gate However the more torque the moto...

Page 15: ...lay flick DIP switch 1 to ON Press and hold down OPN button for the required open delay close delay time you need and release the button For example if you want a 15 second open delay close delay time...

Page 16: ...the OSC button for 30 seconds and release the button Once time is set flick DIP switch 1 back to OFF To start the Auto Close function flick DIP switch 8 to ON and leave it on To disable the Auto Close...

Page 17: ...should be taken to avoid shorting out or otherwise damaging the circuit board Turn on the transformer replace the metal motor cover and test Terminal Block 12 v Low Voltage Transformer Wires 1 5mm Twi...

Page 18: ...over and test Solar Panel Wires RED tipped wire POSITIVE BLACK tipped wire NEGATIVE Terminal Block 1 5mm Twin Active Low Voltage Cable Weather Proof Enclosure Terminal Block from solar regulator Conne...

Page 19: ...ing from normal operating conditions G Force Automatic Gates is not responsible for any special incidental consequential or punitive damages arising from the use or Warranty Returns POLICY 1 year DIY...

Page 20: ...tighten all terminal block screws and ensure any cables are not frayed at the ends 5 Ensure Receiver is firmly mounted 6 Tighten all mounting and attachment bolts 7 Check screws on Push Button covers...

Reviews: