![FUTABA SkyLeaf BP Instruction Manual Download Page 9](http://html1.mh-extra.com/html/futaba/skyleaf-bp/skyleaf-bp_instruction-manual_2351778009.webp)
9
Main wing
4
1. Installation of Ailerons
Aileron
1
1
4
5
6
2
3
ŪƄƓ
ŷƋƈŃƄƌƏƈƕƒƑŊƖŃƈȭƈƆƗƌƙƈƑƈƖƖŃƌƖŃƊƒƒƇŃƚƌƗƋŃƑƒŃƆƏƈƄƕƄƑƆƈآ
űƒŃ
ƆƏƈƄƕƄƑƆƈ
Sky Leaf Tip
● Spread the hinge insert point so that
the paper hinge enters.
2-Wings
ŗŐūƌƑƊƈƖŃƌƑƖƈƕƗŃƓƒƌƑƗ
Take
clearance
between
Aileron
and
Wing
(about
1 mm
). (So that Aileron and Wing do not interfere
during operation)
● Put four
paper hinges
in Aileron.
ŬƑƖƈƕƗŃƋƄƏƉ
ŦŤŃƊƏƘƈ
● Pour
CA glue
into all
4 hinges.
Make glue wick to the interior.
Ŷ,IWKHDLOHURQLVR൵GXULQJÀLJKWLW
ZLOOEHXQFRQWUROODEOHDQGFUDVK
● Push the
Aileron
into the wings.
آ ťƈŃƆƄƕƈƉƘƏŃƑƒƗŃƗƒŃƐƌƖƗƄƎƈŃƗƋƈŃƉƕƒƑƗŃƖƌƇƈŃ
ƄƑƇŃƅƒƗƗƒƐŃƖƌƇƈő
● Pour
CA glue
into the
paper hinge
inserted in the wing.
ųƘƖƋŃƌƑ
űƒŃŦƏƈƄƕƄƑƆƈ
●
Move the aileron
after drying. Check that the
aileron is securely attached.
ŰƒƙƈŃƌƗŃƖƈƙƈƕƄƏŃƗƌƐƈƖő
● Attach the aileron to the other main
wing by the same work.