1. INSTALLATION
1-8
• DO NOT apply the adhesive to the four vent holes near the name plate.
1.4.2
Required tools
The following tools should be prepared in advance for this installation.
1.4.3
How to mount the Antenna Unit
1. Construct a suitable mounting platform, minimum size 260 mm (bow-stern)
240
mm. If corrosive material is used, take necessary anti-corrosion measures.
Note:
The mounting platform must be flat, level and firmly secured.
2. Make a cable hole (
25±2 mm) for passing the
supplied antenna cable through the center of
the mounting platform.
Note:
The cable hole should be made accord-
ing to the above specifications. An excessive-
ly large hole can result in water leakage.
Alternatively, an excessively small hole can
prevent cable routing.
3. Pass the NMEA 2000 antenna cable through
the hole made at step 2 so the connector of
the antenna cable exits on the upper side of
the mounting platform.
Name
Remarks
Hole Saw
For making the cable hole (
25 mm)
File
For smoothing the cut edge of the cable hole
Phillips-head Screwdriver
#2
Bottom view of the antenna unit
Vent hole (four places)
Note:
Do not apply the
adhesive here.
Vent hole (four places)
Note:
Do not apply the
adhesive here.
Name plate
Name plate
Mounting platform
(top view)
Mounting platform
(top view)
240 mm
(min.)
240 mm
(min.)
Cable hole
(ø25±2 mm)
Cable hole
(ø25±2 mm)
260 mm (min.)
(bow-stern direction)
260 mm (min.)
(bow-stern direction)
Antenna cable
connector
Antenna cable
connector
Summary of Contents for SCX-20
Page 10: ...EQUIPMENT LIST viii This page is intentionally left blank ...
Page 26: ...1 INSTALLATION 1 16 This page is intentionally left blank ...
Page 34: ...3 MAINTENANCE 3 2 This page is intentionally left blank ...
Page 48: ...構成表 viii このページは空白です ...
Page 70: ...3 章 保守 3 2 このページは空白です ...
Page 80: ...D 1 27 Sep 2019 H MAKI ...
Page 81: ...D 2 31 Jul 2019 H MAKI ...
Page 82: ...D 3 24 Sep 2019 H MAKI ...
Page 83: ...D 4 24 Sep 2019 H MAKI ...
Page 84: ...D 5 12 Nov 2019 H MAKI ...
Page 85: ...D 6 27 Nov 2019 H MAKI ...