1. INSTALLATION
1-3
4. Connect the antenna cable to the antenna unit connector.
Note:
DO NOT apply the supplied adhesive to the four vent holes near the name
plate.
5. Wrap self-vulcanizing tape
twice
at the junction between connectors of the anten-
na unit and the antenna cable. Then wrap vinyl tape
once
over the self-vulcaniz-
ing tape for waterproofing.
Note:
Wrap the tapes so as to cover both connectors of the antenna unit and the
antenna cable.
6. Adjust the direction of the antenna unit so the bow mark on its base is facing the
ship’s bow.
Note:
When the antenna unit is placed on the platform, make sure that the plat-
form is not inclined.
Bow mark
Cable hole
ø25±2 mm
Cable hole
ø25±2 mm
Bottom view of the antenna unit
Vent hole (four places)
Note:
Do not apply the
adhesive here.
Vent hole (four places)
Note:
Do not apply the
adhesive here.
Name plate
Name plate
Self-vulcanizing tape
(Double layer)
Self-vulcanizing tape
(Double layer)
Connector of antenna unit
Vinyl tape
(Single layer)
Vinyl tape
(Single layer)
Summary of Contents for SCX-20
Page 10: ...EQUIPMENT LIST viii This page is intentionally left blank ...
Page 26: ...1 INSTALLATION 1 16 This page is intentionally left blank ...
Page 34: ...3 MAINTENANCE 3 2 This page is intentionally left blank ...
Page 48: ...構成表 viii このページは空白です ...
Page 70: ...3 章 保守 3 2 このページは空白です ...
Page 80: ...D 1 27 Sep 2019 H MAKI ...
Page 81: ...D 2 31 Jul 2019 H MAKI ...
Page 82: ...D 3 24 Sep 2019 H MAKI ...
Page 83: ...D 4 24 Sep 2019 H MAKI ...
Page 84: ...D 5 12 Nov 2019 H MAKI ...
Page 85: ...D 6 27 Nov 2019 H MAKI ...