13. INSTALLATION
13-17
Matching box (option, required for 1kW transducer)
The optional matching box (Type: MB-1100, Code No.: 000-041-353) is required to-
connect the optional transducers 50B-6, 50B-6B, 200B-5S, 50/200-1T and 50/200-
12M.
*: With 10P connector cable
**: For connecting two transducers
About CAN bus connections
CAN bus is a communication protocol that shares multiple data and signals through a
single backbone cable. You can simply connect any CAN bus devices onto the back-
bone cable to expand your network onboard. With CAN bus, IDs are assigned to all
the devices in the network, and the status of each sensor in the network can be de-
tected. All the CAN bus devices can be incorporated into the NMEA2000 network. For
detailed information about CAN bus wiring, see “Furuno CAN bus Network Design
Guide” (Type: TIE-00170) on Tech-Net), or contact your dealer.
Part
Type
Code no.
Qty
Matching Box*
MB-1100
000-041-353
1
Crimp-on Lug
FV1.25-3 (LF)
000-116-756-10
6
Cord Lock**
NC-1
000-168-230-10
1
Jumper block setting
J2: No output reduction (default)
J1: Output reduction
Transducer
50B-6/6B
50kHz
200kHz
SHIELD
BLK
RED
TB2
1
2
3
4
5
J2 J1
WHT
3
2
1
BLK
TB1
02P6348
BLK
RED
Connect 10P
connector to
XDR port on
rear of
display unit.
Green
(shield)
Detach grommet;
attach cord lock.
Transducer
200B-5S
Vinyl Sheath
Taping
Shrink Tubing
Shield
Crimp-on Lug
FV1.25-3 (LF)
Summary of Contents for GP-1870F
Page 1: ......
Page 44: ...1 OPERATIONAL OVERVIEW 1 28 This page is intentionally left blank...
Page 118: ...9 MEMORY CARD OPERATIONS 9 6 This page is intentionally left blank...
Page 142: ...11 CUSTOMIZING YOUR UNIT 11 6 This page is intentionally left blank...
Page 172: ...13 INSTALLATION 13 24 This page is intentionally left blank...
Page 186: ...APPENDIX 3 JIS CABLE GUIDE AP 14 This page is intentionally left blank...
Page 188: ...APPENDIX 4 INSTALLATION OF TEMPERATURE SENSORS AP 16...
Page 189: ...APPENDIX 4 INSTALLATION OF TEMPERATURE SENSORS AP 17...
Page 190: ...APPENDIX 4 INSTALLATION OF TEMPERATURE SENSORS AP 18...
Page 191: ...APPENDIX 4 INSTALLATION OF TEMPERATURE SENSORS AP 19...
Page 196: ...6 Apr 2012 H Maki D 1...
Page 197: ...6 Apr 2012 H Maki D 2...
Page 198: ...6 Apr 2012 H Maki D 3...
Page 199: ...6 Apr 2012 H Maki D 4...
Page 200: ...D 5...
Page 208: ......
Page 209: ......