ASSEMBLY IS COMPLETED
I.
Prepare a bed slat using two slats (#11), one center connector
(#F) and two end caps (#G). See diagram below for the correct
sequence in connecting those parts.
II.
Align the end caps (#G) with the pre-drilled holes on each side of
the side rails (#2) and press firmly down on both end caps (#G)
to lock with the side rails (#2). Then press firmly down on the
center connector (#F) to lock with the center support rail (#4).
III.
Repeat the process above to assemble the remaining bed slats
onto the side rails (#2) and the center support rail (#4).
IV.
Insert the 6 assembled drawers into the designated area of the
side rails (#2).
V.
Make sure the bed is rested on a flat surface and does not feel
loose or wobbly. If it does, double check that the bolts/screws
are secured and properly tightened.
Note: The correct position of the slats should be
arcing UPWARD when placing on the rails.
#F x 15 pcs
#G x 30 pcs
#2
#4
#12
Summary of Contents for CM7009CK
Page 2: ...Page 2 of 10...
Page 11: ...Rev 17 08 11 For more information contact our team service ec foagroup com...
Page 12: ......
Page 13: ......
Page 14: ......
Page 22: ...Page 2 of 10...