-3-
6.
Requirements for the beer samples to be analysed --------------------
15
Entrainment -----------------------------------------------------------------------------------
15
Error message / Trouble shooting ----------------------------------------------------
16
Technical data -------------------------------------------------------------------------------
16
Ordering data-----------------------------------------------------------------------------------
17
Spare and consumable parts -----------------------------------------------------------
17
Guarantee conditions------------------------------------------------------------------------
17
Installation and Initial Operation
1.
Initial Operation / Unpacking and checking package contents
The following parts must be available:
a) FermentoFlash
b) 1 mains cable
c) 1l Cleaning solution
d) Report printer
e) Power supply cable (6 V) for report printer
f) Parallel cable for connecting the printer
g) Operating instructions for the FermentoFlash and for the printer
h) 1 hose for the output (waste)
i) 1 Erlemeyer flask, 100 ml
2.
Initial Operation / Installation
Place the machine on a horizontal surface.
Note:
If case of using deionized water instead of distilled water, the water
should be degassed.
This can be done by following:
a) the water is degassed by using fold filter.
or
b) the water is boiled.
-4-
3.
Initial Operation / Connect machine to the power.
Power connection: 230 V / 180 VA or 115 V / 180 VA
The power connection is located on the back side of the device together with
the on/off switch, voltage selector switch and mains fuse.
First select the correct mains voltage using the voltage selector switch: 230 V
or 115 V.
4.
Initial Operation / Connect mains cable
Ensure that the machine is connected to an earthed socket which complies
with safety regulations.
5.
Initial Operation / Connecting the Hose
Connect the waste hose to the connector located on the back of the device
and lead the end of the hose either to a waste vessel of corresponding size
(approx. 5-10 l) or directly to a drain.
6.
Initial Operation / Connect printer
Plug the printer cable into the 6 V connection on the rear of the machine. Plug
the other end of the cable into the corresponding socket on the back of the
printer.
Proceed in a similar way with the parallel cable. Both cables have different
types of connectors so that it is impossible to make incorrect connections.
7.
Initial Operation / Turning the Device on
Turn the device on by the power switch.
After a 15 minutes warm-up phase the device can be used.