© The Fulton Companies 2012
INSTALLATION
RLN-IOM-2012-1205
SECTION 2
2-20
!
WARNING
The exhaust vent installer should be
familiar with Federal Codes as well
as local codes and regulations.
Fulton cannot assume responsibility
for an air intake or exhaust
arrangement where Reliance boilers
are common vented with any other
type of equipment.
4
CAUTION
To prevent the possible re-circulation
of fl ue gases, the vent designer must
take into consideration such things
as prevailing winds, eddy zones,
building confi gurations, etc. It is the
responsibility of the installer to locate
the exhaust duct in such a way that it
does not become blocked due to snow,
ice, and other natural or man-made
obstructions.
Do not locate the vent termination too
close to shrubbery as fl ue products may
stunt their growth or kill them.
FIGURE 10 - VENTING TERMINATIONS
¡
Wall Thimble Installation
Adhere to the following for installation (see Figure 11):
1. The thimble is inserted through the wall from the outside. Secure the
outside fl ange to the wall with nails or screws, and seal with adhesive
material.
2. Install the inside fl ange to the inside wall, secure with nails or screws, and
seal with adhesive material.
3. Pass the vent pipe through the thimble from the outside and join to the
rest of the vent system.
4. Seal the pipe to the thimble fl ange with adhesive material.
5. Install two pipe retaining clamps around the intake as well as vent pipes
on both ends of the wall thimble (on the inside and outside of the wall)
through which intake and vent pipes are passed. They will prevent the
intake and vent pipes from being pushed or pulled.
¡
Horizontal Vent Termination
Adhere to the following for installation:
1. The vent termination is joined to the vent pipe outside the wall. Use the
same joining procedures for vent pipe and fi ttings. The termination of the
vent system must be at least 12 inches (304.8 mm) above the fi nished
grade, or at least 12 inches (304.8 mm) above normal snow accumulation
Summary of Contents for Reliance 1000
Page 2: ......
Page 4: ...TheFultonCompanies2012 TABLEOFCONTENTS RLN IOM 2012 1205 0 2...
Page 42: ...TheFultonCompanies2012 OPERATION RLN IOM 2012 1205 SECTION3 3 12...
Page 50: ...TheFultonCompanies2012 MAINTENANCE RLN IOM 2012 1205 SECTION4 4 8...
Page 51: ......
Page 52: ......
Page 59: ......