OPERATION (cont.)
Inverter parallel operation
It is possible to connect two Full Boar SD4000irs generators to each other, using a
parallel cable kit (sold separately), to increase available power output.
1.
Connect PARALLEL OPERATION CABLES to two SD4000irs generators
according to the instructions provided with the cable kit.
2.
Make sure the Economy throttle switch (13) is in the OFF position on both
generators.
3.
All electronic devices should be turned “OFF” and disconnected from inverter
generators prior to starting generator engines.
4.
Start generator engines. Make sure the green output indicator LED (11) comes
on for each generator.
5.
When engines have stabilized, plug in electronic device to AC socket (8) and
turn on first load.
6.
Allow generator output to stabilize (engine and attached devices run evenly)
before plugging in the next load.
Maximum Power in Parallel Operation:
7.2kVA
Rated Power in Parallel Operation:
6.3kVA
Limit operation time to 3 seconds for load requiring maximum output. For
continuous operation, do not exceed the rated output.
Note:
It is strongly recommended to plug in devices with the largest output first
and the smallest output last to help prevent overloading the generator.
DANGER!
Never connect the paralleling cord to the inverters with
the inverters running. The inverters must not be running and both the
paralleling cord switches must be off when connecting the cords.
WARNING!
Do not attempt to parallel the inverter with any other
manufacturers’ inverters. Do not use the paralleling cord for any
application other than inverter paralleling. Do not use this cord on other
manufacturers’ inverters.
WARNING!
Always ensure that both ends of the paralleling cord are
switched off before connecting the inverters.