LED
L
IGHT
E
NGINE
A
PPLICATION
P
ROGRAM
MANUAL FOR LED LIGHT ENGINE KIT INSTALLATION
Address: 12705 South Van Ness Ave., Hawthorne, CA 90250 · Telephone: 1-323-599-5000 · Fax: 1-323-754-9060 · E-mail:
· Website:
www.fulham.com
01/14/16
LED 7” Engine, Rev D Page 6
7.
On
the
rear
side
of
the
luminaire,
secure
the
grounding
cable
by
passing
the
already
inserted
8
‐
32
x
3/8”
Ground
Green
Machine
Screw
(Part:
C)
in
the
following
order:
8.
See
the
section
below
“Connecting
Power
to
the
LED
System”
for
proper
connection
steps.
9.
Mount
the
luminaire
to
the
ceiling
by
using
the
threaded
stem
and
nut
(arrow)
or
the
key
holes
(circles).
See
picture
#5.
10.
Re
‐
attach
and
secure
the
lens
to
the
luminaire.
See
Picture
#6.
Picture
#4
Picture
#6
7.1 Retrofit Kit Assembly (7” Round)
Warning: Disconnect power when servicing fixture.
Warranty
Please see our warranty policy on LED system.
8.0 Warranty and Contact Information
WARNING:
Ground
screw
assembly
should
not
be
torque
down
over
14
lb
‐
in,
any
higher
than
14lb
‐
in
will
result
of
striping
the
8
‐
32
x
3/8”
Ground
Green
Machine
Screw
(Part:
C).
Picture
#5
Connecting power to the LED System:
1)
Connect the copper wire (Ground) from the luminaire housing to the ground wire (Ground) that is being fed by
the power source. Connect these two wires by using a 16-18 AWG Gauge Wire Nut.
2)
Connect the white wire (Neutral) from the LED Engine (Part: A) to the white wire (Neutral) that is being fed by
the power source. Connect these two wires by using a 16-18 AWG Gauge Wire Nut.
3)
Connect the black wire (Line) from the LED Engine (Part: A) to the black wire (Line) being fed by the power
source. Connect these two wires by using a 16-18 AWG Gauge Wire Nut.
D
E
C
IMPORTANT:
After
installation
of
ground
wire
check
for
grounding
connection
to
the
luminaire
housing.
A.
8
‐
32
External
Tooth
Lock
Washer
(Part:
D)
B.
Ground
Cable
C.
8
‐
32
Hex
Nut
(Part:
E)