72
Operating Manual
TX140
S1
Starting up and operation
–
System already installed
:
Ê
Press the On/Off button (see item 12 in figure
8 on page 62
).
The server is switched on, performs a system test and boots the
operating system.
Switching the server off
The power-on indicator lights up green (see item 11 in figure
8 on page 62
).
Ê
Shut down the operating system properly.
The server is switched off automatically and goes into standby mode. The
power-on indicator lights up orange.
I
If the operating system does not switch the server off automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
–
Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S3, you can configure
that the server is switched on/off controlled by timer.
–
Ring indicator
The server is switched on by an internal or external modem.
–
Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet
TM
).
–
After power failure
The server automatically reboots following a power failure (depending on the
settings in the BIOS or in iRMC S3).
Summary of Contents for PRIMERGY TX140 S1
Page 1: ...Operating Manual English PRIMERGY TX140 S1 Server Operating Manual Edition June 2011 ...
Page 6: ...Operating Manual TX140 S1 ...
Page 10: ...Operating Manual TX140 S1 Contents ...
Page 30: ...30 Operating Manual TX140 S1 Functional overview ...
Page 58: ...58 Operating Manual TX140 S1 Hardware installation ...
Page 80: ...80 Operating Manual TX140 S1 Property and data protection ...