TX140 S1
Operating Manual
49
Hardware installation
5.2
Setting up the floorstand model
I
If you are not installing a PRIMERGY TX140 S1 floorstand model, skip
this section and continue reading at
section "Installing/removing the rack
model" on page 50
.
Ê
Transport the server to the place where you want to set it up.
Ê
Unpack the server (see
section "Unpacking the server"
).
Ê
Set up the server.
V
CAUTION!
– The device must be protected from direct sunlight.
– The required minimum distances for operation and maintenance
areas must be adhered to.
– The server must be accessible at the rear for connection to other
devices (e.g. memory subsystem).
– The mains plug must be accessible easily and safely.
– There must be a clearance of at least 200 mm in front of and
behind the server to ensure adequate ventilation of the
subsystem.
Ê
Wire the server. Follow the instructions in sections
"Connecting devices to
the server" on page 54
and
"Notes on connecting/disconnecting cables" on
page 57
.
Ê
Connect the server to the mains (see section
"Connecting the server to the
mains" on page 55
).
Summary of Contents for PRIMERGY TX140 S1
Page 1: ...Operating Manual English PRIMERGY TX140 S1 Server Operating Manual Edition June 2011 ...
Page 6: ...Operating Manual TX140 S1 ...
Page 10: ...Operating Manual TX140 S1 Contents ...
Page 30: ...30 Operating Manual TX140 S1 Functional overview ...
Page 58: ...58 Operating Manual TX140 S1 Hardware installation ...
Page 80: ...80 Operating Manual TX140 S1 Property and data protection ...