22
Upgrade and Maintenance Manual
TX1310
M3
Before you start
2.2
Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to the following table for an overview of steps taken into account for
calculating the average task duration:
Hardware: 10 minutes
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on page 61
Disassembly
yes
Making the server available
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly
yes
Reassembling the server
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
Summary of Contents for PRIMERGY TX1310 M3
Page 6: ...Upgrade and Maintenance Manual TX1310 M3 Version history ...
Page 28: ...28 Upgrade and Maintenance Manual TX1310 M3 Before you start ...
Page 42: ...42 Upgrade and Maintenance Manual TX1310 M3 Important information ...
Page 60: ...60 Upgrade and Maintenance Manual TX1310 M3 Basic hardware procedures ...
Page 94: ...94 Upgrade and Maintenance Manual TX1310 M3 Hard disk drives HDDs ...
Page 154: ...154 Upgrade and Maintenance Manual TX1310 M3 Processor CPU ...
Page 174: ...174 Upgrade and Maintenance Manual TX1310 M3 Front panel and front USB ...
Page 204: ...204 Upgrade and Maintenance Manual TX1310 M3 System board and components ...
Page 234: ...234 Upgrade and Maintenance Manual TX1310 M3 Appendix ...