background image

Introduction

Important notes

Installation

Preparation for use and operation

Troubleshooting

Related publications and index

Summary of Contents for PRIMERGY S10

Page 1: ...orage Subsystem Xenia Fierley Fujitsu Siemens Computers GmbH cognitas PS 85521 München_Ottobrunn e mail Internet DOCetc mchp siemens de Tel 089 61001 157 Fax 0 89 6 1001 10 3 U41181 J Z156 1 74 Sprachen En Edition October 2000 ...

Page 2: ...it your individual needs Fax forms for sending us your comments are included at the back of the manual There you will also find the addresses of the relevant User Documentation Department Copyright and Trademarks Copyright 2000 Fujitsu Siemens Computers GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trade...

Page 3: ...Introduction Important notes Installation Preparation for use and operation Troubleshooting Related publications and index ...

Page 4: ......

Page 5: ...on 14 2 9 Environmental protection 14 3 Installation 17 3 1 Installation steps 17 3 2 Unpacking the storage subsystem 18 3 3 Mounting the subsystem in the rack 18 3 3 1 Routing cables 19 3 4 Setting the SCSI ID 20 3 5 Connecting the storage subsystem 20 3 5 1 Connecting SCSI cables 21 3 5 2 Connecting the power cable 21 3 6 Connecting and disconnecting cables 22 4 Preparation for use and operation...

Page 6: ...U41181 J Z156 1 74 Contents Related publications 31 Index 33 ...

Page 7: ...the control and display elements and the logic for controlling the power supply and monitoring the fan It also estab lishes a connection between the external and internal cabling All the necessary connectors for the internal cabling are located on this module socket for the power supply for the fan connector and for the internal SCSI line as well as the socket for the external SCSI output see also...

Page 8: ...ould also have a good working knowledge of the English language 1 2 Notational conventions The meanings of the symbols and fonts used in this manual are as follows Text in italics indicate commands or menu item Quotation marks indicate names of chapters and terms that are being emphasized Ê Texts which follow this symbol describe activities that must be performed in the order shown I This symbol i...

Page 9: ...RVICE GmbH The following aspects were investigated General comprehensibility User friendliness Occupational hygiene and safety for the users Safety of the application and observance of the relevant regulations standards and guidelines Environmental protection Layout realization readability Conformity with the product Accuracy and completeness of the contents The criteria for the audit were develop...

Page 10: ...ted current 240 V 2 0 A 100 V 4 0 A Apparent power heat transfer max 200 W Power factor PF 65 Effective power of typical peripheral devices the actual effective power will depend on the number and type of peripheral devices installed DLT7000 39 W LTO 50 W SLR100 23 1 W Mammoth 18 W Magneto Optical Disk 15 W Dimensions and weight Height mm 133 Width mm 483 Depth mm 646 Weight kg ca 20 depending on ...

Page 11: ...1 Standards complied with Product safety and ergonomics IEC 60950 DIN EN 60950 UL 1950 CSA 22 2 No 950 Electromagnetic compatibility Emitted interference EN 55022 class B FCC part 15 class B Noise immunity EN 50024 FCC verification Class B CE label EMC guideline 89 339 EWG EN 61000 3 2 EN 61000 3 3 Product safety 73 23 EEC Approval certification GS CSA US C CB certificate Noise development ISO 929...

Page 12: ......

Page 13: ...ld only be performed by technicians service personnel or technical specialists Equipment repairs should only be performed by qualified staff Any failure to observe the guidelines in this manual could expose the user to risks electric shock fire hazards and could also damage the equipment Note that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion ...

Page 14: ... lines during a storm lightning hazard The system unit and the directly connected external storage subsystems should be connected to the same power supply distributor Otherwise you run the risk of losing data if for example the central processing unit is still running but the storage subsystem has failed during a power failure Make sure that no objects such as bracelets or paper clips fall into or...

Page 15: ...The equipment and tools you use must be free of static charge Ê Remove the power plug before installing or removing modules containing electrostatic sensitive components Ê Only hold modules containing electrostatic sensitive components by their edges Ê Do not touch any of the pins or track conductors on a module containing electrostatic sensitive components Ê Use a grounding strap designed for the...

Page 16: ...its for a Class B digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful inter ference to radio c...

Page 17: ...ing to the current rating for your unit Please consult the table below for the selection criteria for power cords used in the United States and Canada The power cord for this unit has been packed separately and has been selected according to the country of destination It must be used to prevent electric shock Use the following guide lines if it is necessary to replace the original cord set The fem...

Page 18: ...ed Kingdom Should the plug on the flexible cord not be of the type for your socket outlets do not use an adapter but remove the plug from the cord and discard Carefully prepare the end of the supply cord and fit a suitable plug V This appliance must be earthed IMPORTANT The wires in this mains lead are colored in accordance with the following code Parallel Tandem For units set at 115 V For units s...

Page 19: ...red Brown must be connected to the terminal which is marked with the letter L or colored Red 2 7 Notes on mounting in the rack When connecting and disconnecting cables observe the notes in the documentation for your PRIMERGY system and the comments in the Important notes chapter in the corresponding rack operating manual supplied with the rack Ensure that the anti tilt bracket is correctly mounted...

Page 20: ...o account important criteria such as durability selection of materials and coding emissions packaging the ease with which the product can be dismantled and the extent to which it can be recycled This saves resources and thus reduces the harm done to the environment Notes on saving energy Devices that do not have to be on permanently should not be switched on until they need to be used and should b...

Page 21: ... Fujitsu Siemens Computers Recycling Center D 33106 Paderborn Tel 49 5251 8180 10 Fax 49 5251 8180 15 Further information on environmental protection The Fujitsu Siemens Computers representative for environmental protection will be happy to answer any further questions you may have concerning environ mental protection Fujitsu Siemens Computers Referat Umweltschutz Werner von Siemens Straße 6 D 861...

Page 22: ......

Page 23: ...see next section Unpacking the storage subsystem Ê Mount the storage subsystem in the rack see section Mounting the subsystem in the rack on page 18 Ê Attach the cables according to the rack configuration required Ê Set the SCSI bus address of the installed backup units see section Setting the SCSI ID on page 20 Ê Connect the server to the power supply see section Connecting the power cable on pag...

Page 24: ...rack V The rack may tip over if more than one heavy unit is removed To mount the subsystem in the DataCenter Rack a support bracket must first be mounted on the rear left support upright The support bracket must be mounted level with the lower edge of the server Cage nuts and or spring nuts must also be inserted in the support uprights The support bracket is used for the fixing the left carrier ra...

Page 25: ...n the support bracket in the rack using the Allen key No 5 Please note that the guide nubs of the rails next to the spring nuts must fit into the holes in the support uprights and or in the support bracket Ê Slide the subsystem unit into the rack and fasten it to the rack using the four knurled screws To remove the subsystem follow the same procedure in reverse order 3 3 1 Routing cables The artic...

Page 26: ...e SCSI ID of the installed backup units on this label This makes it easier to identify the backup units 3 5 Connecting the storage subsystem The ports are on the rear of the subsystem figure 2 Figure 2 PRIMERGY S10 ports 1 SCSI system port 68 pin SCSI connector SCSI input for the connection to the host adapter SCSI LVD SE controller 2 SCSI system port 68 pin SCSI connector SCSI output for the dais...

Page 27: ...or marked 2 in figure 2 on page 20 A maximum of two PRIMERGY S10 storage subsystems can be daisy chained on one SCSI bus 3 5 2 Connecting the power cable Ê Connect the power cable of the storage subsystem to a free insulated socket on the grounded connector strip in the rack see the Technical Manual for the rack You can set the voltage to the desired voltage range 115 V or 230 V using the voltage ...

Page 28: ...cables and make a note of the function of each cable Above all observe the safety notes in chapter Important notes on page 7 Plug all power cables into the correctly fused and grounded power outlets Make sure that the power cables of the devices in the rack are plugged in so that there is an even distribution of power in the three phases L1 L2 L3 for more information see the rack manual If the dev...

Page 29: ...h see also chapter Troubleshooting on page 25 1 Power LED green signals that power is on 2 Disk LED yellow indicates activity on the SCSI bus access to the backup units 3 local remote ON switch service switch controls the on off function and can only be accessed from the outside using a special tool In the remote position right standard setting the storage subsystem is switched on and off from the...

Page 30: ......

Page 31: ...he power plug from the power outlet Ê Remove all the cables from the storage subsystem Ê Remove the four screws from the front of the storage subsystem pull the storage subsystem from the rack and place it on a smooth surface Figure 4 Opening the housing Ê Remove the three screws marked 1 on both sides and move the housing cover approximately 2 cm in the direction indicated 2 1 2 1 1 ...

Page 32: ...ose the housing you follow the same procedure in reverse order 5 2 Storage subsystem cannot be switched on Ê Check the position of the Local Remote switch and if necessary move the switch to the Remote position see also section Switching the storage subsystem on off on page 23 Ê Check the connections to the CPU and the connection to the power supply Ê Boot the system again ...

Page 33: ... for the backup unit for help The address jumpers of most of the backup units are located on the back of the device Ê Open the storage subsystem housing see section Opening the storage subsystem housing on page 25 and set the SCSI ID see section Setting the SCSI ID on page 20 5 5 Fan failure The storage subsystem is cooled by means of a fan The fan is monitored to make sure it does not fall below ...

Page 34: ...unit you must remove the frame together with the installed devices from the housing Ê Open the housing of the storage subsystem see section Opening the storage subsystem housing on page 25 Ê Remove all the cables from the installed backup devices in the frame involved Figure 6 Opening the housing cover Ê Release the mounting frame by pressing the locking bar 1 and move it in the direction indicate...

Page 35: ...icated To install a backup unit you follow the same procedure in reverse order Ê Before you install a new backup unit set the SCSI ID see section Setting the SCSI ID on page 20 I A flat cable is used for the internal SCSI cabling 16 bit devices are connected directly 8 bit devices require a 50 to 68 pin adapter Mixed operation using both 8 bit and 16 bit devices is therefore possible 1 1 ...

Page 36: ......

Page 37: ...U41181 J Z156 1 74 31 Related publications Please apply to your local office for ordering the manuals 1 Safety Guarantee and Ergonomics 2 PRIMERGY DataCenter Rack ...

Page 38: ......

Page 39: ...agnetic compatibility 5 10 EMC guideline 5 emitted interference 5 environmental condition 5 environmental protection 14 ergonomics 5 F fan failure 27 FCC notices 10 frame 28 H height units 1 18 housing 25 housing cover 25 L label 20 low voltage directive 10 LVD interface module 1 LVD SE SCSI terminator 1 M maintenance area 5 manufacturer s notes 10 mixed operation 29 N noise immunity 5 noise level...

Page 40: ...ty instructions 7 saving energy 14 SCSI ID 27 29 setting 20 select power cord 11 spring nuts 18 standards complied with 5 system port 21 T target group 2 technical data 4 U unpacking 18 V ventilation 1 ventilation distance 5 W weight 4 ...

Page 41: ...age Subsystem U41181 J Z156 1 74 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 81730 Munich Germany Fax 49 700 372 00000 Internet DOCetc mchp siemens de http manuals mchp siemens de ...

Page 42: ......

Page 43: ...age Subsystem U41181 J Z156 1 74 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 81730 Munich Germany Fax 49 700 372 00000 Internet DOCetc mchp siemens de http manuals mchp siemens de ...

Page 44: ......

Page 45: ...tsu com Copyright Fujitsu Technology Solutions 2009 Hinweise zum vorliegenden Dokument Zum 1 April 2009 ist Fujitsu Siemens Computers in den alleinigen Besitz von Fujitsu übergegangen Diese neue Tochtergesellschaft von Fujitsu trägt seit dem den Namen Fujitsu Technology Solutions Das vorliegende Dokument aus dem Dokumentenarchiv bezieht sich auf eine bereits vor längerer Zeit freigegebene oder nic...

Reviews: