RX2510 M2
Operating Manual
59
Starting up and operation
Ê
Follow the on-screen instructions (see also section
server and installing the operating system with the ServerView
Installation Manager" on page 63
installing the operating system without the ServerView Installation
Manager" on page 64
).
–
System already installed
:
Ê
Press the On/Off button.
The server is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for
several minutes.
Switching the server off
The Power-on indicator (see
) lights up green.
Ê
Shut down the operating system properly.
The server is switched off automatically and enters standby mode. The power-
on indicator lights up orange.
I
If the operating system does not switch off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
–
Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S4, you can configure
that the server is switched on/off controlled by an internal timer.
–
Ring indicator
The server is switched on by an internal or external modem.
–
Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet™).
Summary of Contents for PRIMERGY RX2510 M2
Page 1: ...Operating Manual English FUJITSU Server PRIMERGY RX2510 M2 Operating Manual February 2016 ...
Page 8: ...Operating Manual RX2510 M2 Contents ...
Page 12: ...12 Operating Manual RX2510 M2 Introduction ...
Page 26: ...26 Operating Manual RX2510 M2 Functional overview ...
Page 66: ...66 Operating Manual RX2510 M2 Starting up and operation ...
Page 68: ...68 Operating Manual RX2510 M2 Property and data protection ...