![Fujitsu PRIMERGY RX2510 M2 Operating Manual Download Page 52](http://html.mh-extra.com/html/fujitsu/primergy-rx2510-m2/primergy-rx2510-m2_operating-manual_121114052.webp)
52
Operating Manual
RX2510 M2
Starting up and operation
iRMC-related status signals
I
For further information, please refer to chapter "Updating or recovering
the iRMC" in the Upgrade and Maintenance Manual.
8
-
AC
connected
indicator
green on
is on in the following cases:
– the system is in power-off mode
but connected to the mains (AC
connected)
– the system has been switched
on and is in power-on delay
I
After connecting the server
to the mains it takes about
60 seconds until the server
enters the standby mode.
off
is off in the following cases:
– the system is not connected to
the mains
– the system is powered on and in
normal operation (S0)
ID indicator
Global error
indicator
Description
blue flashing
off
A remote connection has been
established. Local VGA output has
been disabled during the remote
session.
blue flashing
orange flashing
An emergency flash of the iRMC
firmware is in progress.
Pos. Symbol Indicator
Status
Description
Summary of Contents for PRIMERGY RX2510 M2
Page 1: ...Operating Manual English FUJITSU Server PRIMERGY RX2510 M2 Operating Manual February 2016 ...
Page 8: ...Operating Manual RX2510 M2 Contents ...
Page 12: ...12 Operating Manual RX2510 M2 Introduction ...
Page 26: ...26 Operating Manual RX2510 M2 Functional overview ...
Page 66: ...66 Operating Manual RX2510 M2 Starting up and operation ...
Page 68: ...68 Operating Manual RX2510 M2 Property and data protection ...