Hardware installation
Installing/removing the server in/from the rack
Installing the telescopic rail with variable support
Figure 5: Fit the left telescopic rail in the PRIMECENTER/DataCenter Rack
Ê
Position the left rail (1) on the support bracket with the retaining bolts in the
upper and lower square catch (a).
Ê
Press the left rail together until its front end passes behind the front left
support upright (2), then release.
Ê
Fasten the rail with a screw (M5) to the left front support upright (3).
Ê
Repeat the steps with the right telescopic rail (to be secured to the right
support uprights).
Ê
Fit the PRIMECENTER/DataCenter Rack cable management as described
in the technical manual for the rack.
Ê
Insert the server (see section
“Inserting the server” on page 51
).
Ê
Route the cables once the server has been inserted, as described in the
Technical Manual for the rack in question.