44
Operating Manual
RX100
S7
Important information
4.6
Notes on installing the server in the rack
V
CAUTION!
●
For safety reasons, at least two people are required to install the
server in the rack because of its weight and size.
(For the Japanese market, please refer to "
安全上の注意
".)
●
Never lift the server into the rack using the QRLs (Quick Release
Levers) on the front panel.
●
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical
manual for the corresponding rack. The technical manual is supplied
with the corresponding rack.
●
When installing the rack, make sure that the anti-tilt mechanism is
correctly fitted.
●
For safety reasons, no more than one unit may be removed from the
rack at any one time during installation and maintenance work.
●
If several units are simultaneously removed from the rack, there is a
risk that the rack could tip over.
●
The rack must be connected to the power supply by an authorized
specialist (electrician).
●
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the
power supply's fuse protection must comply with the requirements for
non-industrial power supply networks for the type A connector.
Summary of Contents for PRIMERGY RX100 S7
Page 1: ...Operating Manual English PRIMERGY RX100 S7 Server Operating Manual Edition June 2011 ...
Page 6: ...Operating Manual RX100 S7 ...
Page 10: ...Operating Manual RX100 S7 Contents ...
Page 30: ...30 Operating Manual RX100 S7 Functional overview ...
Page 52: ...52 Operating Manual RX100 S7 Hardware installation Figure 2 Mechanical requirements ...
Page 60: ...60 Operating Manual RX100 S7 Hardware installation ...
Page 78: ...78 Operating Manual RX100 S7 Starting up and operation ...
Page 80: ...80 Operating Manual RX100 S7 Property and data protection ...