
5
E
Conversion procedure
The following is the procedure to convert the server from a deskside model to a rackmount
model.
When installing or removing hardware options from the server,
turn off the server, all peripheral devices, the server monitor
module, and any other the connected devices. Also unplug all
power cords. Failure to do so can lead to electric shock.
•
Contact your maintenance engineer to perform the conver-
sion.
•
For safety reasons, make sure the server is located on a sta-
ble and level surface when perform the conversion work as
the combined weight can be in excess of 30kg.
•
Also, work in an open space as the rackmount must be laid
horizontally to perform the conversion.
•
Make sure that the system is operating properly before per-
forming the conversion.
•
Devices inside the server remain hot after shutdown. Wait for
approximately 10 minutes after shutdown before installing or
removing hardware options from the server.
•
Static electricity can damage the internal hardware compo-
nents. Wear a wrist grounding strap when working inside the
server.
•
Do not touch any panel circuitry. Hold the metallic areas or
the green areas of the circuit boards.
Summary of Contents for PRIMERGY PG-R1CK7
Page 7: ...vi ...
Page 9: ...viii ...
Page 11: ...x ...
Page 15: ...4 本製品の梱包物 ...
Page 19: ...8 操作方法 2 ドライブカバーを上方にスライドします 3 ハードディスクカバーを取り外します ハードディスクカバーを手前に倒 して 引き上げて取り外します ドライブカバー ...
Page 43: ...32 操作方法 ...
Page 45: ...34 付録 ...
Page 51: ...vi ...
Page 53: ...viii ...
Page 57: ...4 Ensuring the package ...
Page 87: ...34 ...