
26
Conversion procedure
3
Attach the rail assemblies (from step 1) and insert the rack nuts provided
into the rack holes.
This server requires 4U of cabinet space.
1
Attach the rails.
Fasten the front brackets to the rack with the flathead screws (M6) in the
rack’s 4th and 6th hole positions (counting up from the bracket base) as shown
in the diagram. Fasten the rear brackets in the same manner except using the
screws provided (M6) and washers instead of the flathead screws.
2
Attach the rack nuts provided.
Insert the rack nuts in the 2nd and 11th hole positions (counting from the bot-
tom) as shown in the diagram. When inserting the nuts, make sure to use the
ones provided with the kit (M5) as they have special catches to secure their
hole positions.
Installing to the rack
1
Pull the slide rails toward the front until they click into place.
Make sure to use the rack nuts (M5) provided with the rack con-
version kit and not the ones from the rack.
[Front]
[Rear]
Rack nut
Washers
To 2nd slot hole
To 11th slot hole
4th
6th
M6 flathead
screws
M6 screws
Server bottom
as reference point
1st
6th
Summary of Contents for PRIMERGY PG-R1CK6
Page 7: ...vi ...
Page 9: ...viii ...
Page 11: ...x ...
Page 13: ...2 本製品の梱包物 ブラケット C 1 2 M3 ネジ 6 M4 バインドネジ 4 M4 タップタイトネジ 4 M5 ネジ 1 8 M6 ネジ 1 4 部品 名称 数量 確認 ...
Page 15: ...4 本製品の梱包物 ...
Page 43: ...32 付録 ...
Page 49: ...vi ...
Page 51: ...viii ...
Page 55: ...4 Ensuring the package ...
Page 83: ...32 Conversion procedure ...
Page 85: ...34 ...