174
Upgrade and Maintenance Manual
CX400 M4
Front panel
10.5.3 Installing the front panel cable
Figure 98: Installing the right front panel cable (A)
Ê
Carefully shift the front panel cable through the cable duct.
Ê
Install the right front panel as described in section
.
Figure 99: Installing the right front panel cable (B)
Ê
Connect the front panel cable to the midplane (see circle).
Ê
Insert the cable into the cable guide (see arrows).