Operations
6.1 Device Response to the Reset
This section describes how the PDIAG- and DASP- signals responds when the
power of the IDD is turned on or the IDD receives a reset or diagnostic command.
6.1.1 Response to power-on
After the master device (device 0) releases its own power-on reset state, the master
device shall check a DASP- signal for least 500 ms to confirm presence of a slave
device (device 1). The master device recognizes presence of the slave device
when it confirms assertion of the DASP- signal. Then, the master device checks a
PDIAG- signal to see if the slave device has successfully completed the power-on
diagnostics.
If the master device cannot confirm assertion of the DASP- signal within 500 ms,
the master device recognizes that no slave device is connected.
After the slave device (device 1) releases its own power-on reset state, the slave
device shall report its presence and the result of power-on diagnostics to the master
device as described below:
DASP- signal: Asserted within 450 ms.
PDIAG- signal: Negated within 1 ms and asserted within 30 seconds.
The asserted PDIAG-signal is negated 30 seconds after it is asserted if the
command is not received.
6-2
C141-E250
Summary of Contents for MHW2040AT - Mobile 40 GB Hard Drive
Page 1: ...C141 E250 01EN MHW2080AT MHW2060AT MHW2040AT DISK DRIVES PRODUCT MANUAL ...
Page 4: ...This page is intentionally left blank ...
Page 8: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 74: ...This page is intentionally left blank ...
Page 260: ...This page is intentionally left blank ...
Page 264: ...This page is intentionally left blank ...
Page 266: ...This page is intentionally left blank ...
Page 272: ...This page is intentionally left blank ...
Page 274: ...This page is intentionally left blank ...
Page 276: ......
Page 277: ......
Page 278: ......