![Fujitsu MAW3073 SERIES Specifications Download Page 63](http://html.mh-extra.com/html/fujitsu/maw3073-series/maw3073-series_specifications_121513063.webp)
C141-C011
1-45
(4) LVD DT Data Transfer
Figure 1.23 is the LVD DT Data Transfer measurement point.
*
*
*
*
Figure 1.23 LVD DT Data Transfer measurement point
Notes:
1. V
N
- negated signal
2. V
A
- asserted signal
3. t
m
= 1.25ns minimum
4. V
A
or V
N
are required to drive the 100 mV at the leading edge of the transition. Those signals shall be at
least |100 mV| for at least t
m
before and after the transition.
5. Differential voltage signals in all cases.
6. t
af
and t
ar
shall be less than 3 ns.
7. Any signal structure may occur at the receiver while in the t
af
or t
ar
region including slope reversal.
Summary of Contents for MAW3073 SERIES
Page 6: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 69: ...C141 C011 1 51 Figure 1 26 ARBITRATION phase ...
Page 116: ...1 98 C141 C011 Figure 1 43 Bus phase sequence 1 of 2 ...
Page 117: ...C141 C011 1 99 Figure 1 43 Bus phase sequence 2 of 2 ...
Page 127: ...C141 C011 1 109 Figure 1 47 SPI information unit sequence during initial connection ...
Page 128: ...1 110 C141 C011 Figure 1 48 SPI information unit sequence during data type transfers ...
Page 129: ...C141 C011 1 111 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Page 130: ...1 112 C141 C011 Figure 1 50 SPI information unit sequence during status transfers ...
Page 154: ...1 136 C141 C011 Figure 1 56 Connection to the LVD receivers ...
Page 160: ...2 2 C141 C011 Figure 2 1 Message format ...
Page 165: ...C141 C011 2 7 Figure 2 2 SCSI pointer configuration ...
Page 200: ...This page is intentionally left blank ...
Page 204: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 208: ...This page is intentionally left blank ...
Page 209: ......
Page 210: ......