Preparing for use
!
Please take note of the safety information in the "Important notes" chapter.
Unpacking and checking the delivery
It is recommended not to throw away the original packaging material! It may be required for
reshipment at some later date.
►
Unpack all the individual parts.
►
Check the delivery for damage incurred during transportation.
►
Check whether the delivery agrees with the details in the delivery note.
Should you discover that the delivery does not correspond to the delivery note, notify your local sales
outlet immediately.
Steps for initial setup
Only a few steps are necessary to put your new workstation into operation for the first time:
–
Select location for workstation and set up workstation
–
Connect the monitor, mouse and keyboard
–
Check the voltage at the mains outlet and connect the workstation to an electrical outlet
–
Switching the workstation on
You will learn more about the individual steps in the following sections.
i
External devices
If you have received other devices in addition to your workstation (e.g. a printer or a
modem), do not connect these until after the initial installation. The following sections
contain a description of how to connect these external devices: "Connecting external
devices to the serial port" and "Connecting external devices to the parallel port".
Drives and boards
If you have received drives or boards with your Workstation, please do not install them
until after initial installation. How to install drives and boards is described in the "System
expansions" chapter.
A26361-K665-Z126-1-19, edition 1
7
Summary of Contents for CELSIUS M430
Page 1: ...Workstation Operating Manual English CELSIUS M430 CELSIUS W Operating Manual ...
Page 3: ......
Page 14: ......
Page 86: ......