background image

INSTALLATION AND MAINTENANCE MANUAL 

 

 

TRANSLATION OF THE  
ORIGINAL DOCUMENT 

For additional copies visit: 

www.frost-trol.com

 

GREGAL SOLID LINES 

D008270 

Versión: 2 

-21- 

 

3.

 

OPERATION 

 

3.1.

 

INITIAL START-UP 

 
Connect  the  cabinet  to  the  mains  and  the  display  will  light  up  showing  two 
horizontal  strips.  These  indicate  that  the  control  is  conducting  a  self-test.  After 
approximately  5  seconds  the  temperature  that  has  been  read  by  the  control  will 
appear on the display and the unit will  actuate  itself. 
 
Check to see if the selected operating temperature is correct by pressing the “SET” 
button. The selected temperature will appear on the display. If this is correct, then 
the  control  will  return  to  its  normal  position.  If  you  wish  to  change  the 

temperature,  select  the  temperature  required  using  the 

and 

  buttons  and 

confirm  by  once  again  pressing  “SET”. 
 
In  order  to  obtain  maximum  evaporator  efficiency,  the  thermostatic  expansion 
valve has to be adjusted by the installer. 
 

 

The  control  components  may  only  be  operated  by  the  technician 
responsible  for  the  installation.  The  functions  available  to  users  are 
shutdown, start-up of the unit from the circuit   board  and  the  start-
up  of  the  lighting  from  its  corresponding  switches. 

 
 
The  temperature  control  and  defrost  times  that  we  recommend  for  each  cabinet 
are  based  on  our  experience  and  laboratory  tests.  Different  air  conditions  could 
require controls that are different from those recommended. 

3.2.

 

PRODUCT LOADING 

 
Please,  don’t  load  product  before  three  hours  since  starting  up  the  cabinet. 
Anycase, always check the working temperature before loading products inside. 
 

 

Loaded product should be at least at its range temperature or better. The 
cabinet is not able to decrease product temperature; cabinet only is able 
to preserve temperature. 

 
Please note the following points when loading the cabinet: 
 

-

 

Do not exceed the maximum load limit;  

-

 

Do not obstruct the aspiration grid or air discharge conduits; 

-

 

Do  not  load  products  that  have  higher  temperatures  than  the 
cabinet’s operating temperature; 

-

 

Load the products into the cabinet in such a way that you can ensure 
good stock rotation; 

-

 

Empty spaces should be left between products to  ensure perfect air 
circulation around them.  

 

 

Gloves should be worn when loading products into the cabinet. 

 

Summary of Contents for GREGAL

Page 1: ...TRANSLATION OF THE ORIGINAL DOCUMENT For additional copies visit www frost trol com Versi n 2 D008270 INSTALLATION AND MAINTENANCE MANUAL GREGAL SOLID LINES...

Page 2: ...LATION OF REFRIGERATED DISPLAY CABINET 10 2 1 CABINET LOCATION 10 2 2 UPACKING 11 2 3 LEVELLING 11 2 4 INSTALLATING THE DRAINAGE SISTEM 11 2 5 ASSEMBLY 13 2 6 REFRIGERATING SYSTEM CONNECTION 18 2 7 IN...

Page 3: ...ANCE MANUAL TRANSLATION OF THE ORIGINAL DOCUMENT For additional copies visit www frost trol com GREGAL SOLID LINES D008270 Versi n 2 2 6 2 FINAL SHUTDOWN 28 6 3 DISMANTLING THE CABINET 28 6 4 DECLARTI...

Page 4: ......

Page 5: ...INSTALLATION AND MAINTENANCE MANUAL TRANSLATION OF THE ORIGINAL DOCUMENT For additional copies visit www frost trol com GREGAL SOLID LINES D008270 Versi n 2 3 EEC DECLARATION OF CONFORMITY...

Page 6: ...o break down It s mandatory to leave 8cm between the cabinet rear wall and the supermarket wall to ensure the airflow Keep clear of obstructions all ventilation openings of the cabinet enclosure Don t...

Page 7: ...servicing of the unit For the electrical connection it is mandatory to incorporate a switch disconnector in accordance with installation regulation This switch has to be directly connected to supply t...

Page 8: ...tact qualified service personal before disposal It is completely forbidden to perforate the cabinet If this occur it could create irreparable damages If you wish to stick adhesive signs onto the cabin...

Page 9: ...uctivity from these units and also so that the Marketing Director is able to gain the maximum commercial return possible Read this manual carefully and store it with the refrigeration unit Pay particu...

Page 10: ...of all models The star of the range the Gregal model comes in the traditional heights of 2000 and 2200 mm The cabinet has a wide range of optional accessories If you need details about its assemblage...

Page 11: ...t damaged and no part or accessory is missing For information about missing parts or accessories please contact the Frost Trol Commercial Department or our official representative for your country Thi...

Page 12: ...to be installed Check that the installation location chosen is suitable To do this make sure that there is no air flow present as this could affect the units by blowing hot air into them The unit mus...

Page 13: ...levelling could result in problems with the defrost water drainage which could then freeze and thus cause the unit to break down Poor levelling could result in problems with the drainage of water resu...

Page 14: ...lled as near to the unit s opening as possible Do not use drip piping with nominal diameter less than the pipe provided in the cabinet Place siphons to prevent bad smells Place the drip piping in the...

Page 15: ...4 in position 4 3 in position 3 When the units final positions have been determined you may proceed to fit them together either manually or mechanically be careful to ensure that no pressure is exerte...

Page 16: ...000800 NUT M 8 GALV DIN 934 S 6 _ UVAR000200 ASSEMBLY STEEL DIPSTICK 4x70 3 PRICE HOLDER HONEY COMB XAUX170184 PROFILE H UTAU014998 SCREW TAE 4 2x13 NEGRO On the following pages are instructions for j...

Page 17: ...e the bumper If the cabinet has inox bumper fit them using the bumper aligner 6 Joint cabinets together nesting the cabinet aligner from one in the holders placed on the framework of other one 7 Bring...

Page 18: ...INSTALLATION AND MAINTENANCE MANUAL TRANSLATION OF THE ORIGINAL DOCUMENT For additional copies visit www frost trol com GREGAL SOLID LINES D008270 Versi n 2 16 2 1 3 4 5 6 ND BD 5 7 1 3 2 4 5 6...

Page 19: ...INSTALLATION AND MAINTENANCE MANUAL TRANSLATION OF THE ORIGINAL DOCUMENT For additional copies visit www frost trol com GREGAL SOLID LINES D008270 Versi n 2 17 PLINTH PANNELS UPPER FRINGE ADJUSTMENT...

Page 20: ...osited and accumulate in the solder joint cracks on the low pressure side When the H2O changes state into a solid this causes a protuberance on the outside of the copper piping that will eventually br...

Page 21: ...a certified technician Before obtaining access to terminals all supply circuits must be disconnected Consult the circuit diagrams that are supplied with each cabinet when carrying out the electrical...

Page 22: ...legislation as is providing protection against power surges short circuits and indirect contacts 2 10 DOORS INTALLATION Before starting the cabinet please remove the protection film of the door s glas...

Page 23: ...r the installation The functions available to users are shutdown start up of the unit from the circuit board and the start up of the lighting from its corresponding switches The temperature control an...

Page 24: ...y you will ensure an optimal performance of the cabinet and a longer service life TYPE ZONE P RIODICIT CLEANING EXTERNAL PARTS WEEKLY CLEANING INNER PARTS MONTHLY MAINTENANCE DOORS MONTHLY CLEANING GE...

Page 25: ...r cabinet you must clean and disinfect the inner parts of the cabinet almost every 30 days To do so Remove the cabinet products and put i tonto an adequate cold storage Apply a defrost Wait until the...

Page 26: ...which contain moisturizers abrasives strong acids or caustic substances Remove any oily contamination with a grease cutting cleaner Application Liquid 99 DI water with 1 non abrasive hand soap is a go...

Page 27: ...to spare parts cross section Length of the part if applicable Colour of the part if painted Left of right if necessary Quantity The series number is indicated inside the refrigerated cabinet on the c...

Page 28: ...ectly loaded i e the products do not exceed the maximum load limit and the conservation temperature is suitable for the products Check that there is no air flow that will affect the operation of the u...

Page 29: ...ndmade drawing or photos could be appreciated Thermostat setting Defrost interval Defrost endurance time End defrost temperatura State of the fans on defrost cycle on off Evaporating pressure measured...

Page 30: ...uired to deliver the product for disposal to the collection centre specified by the local authorities for recovery and recycling of professional WEEE In the case of trade in of the old product for a n...

Page 31: ...onal before disposal 6 4 DECLARTION OF ROHS CONFORMITY We Frost trol S A declare under our sole responsibility that the refrigerated cabinet complies with the provisions of Directive 2002 96 EEC RoHS...

Page 32: ...fo frost trol com ESPA A PLANTA CABANES CV 159 Km 2 12180 Cabanes Castell n Spain Tel 34 964 342 740 Fax 34 964 215 148 info frost trol com M XICO Av Pirules 134 B esquina con Av Tejocotes Fraccionami...

Reviews: