Ensure an adequate supply of fresh air with a ventilation rate of at least 20 m³/hour.
-
Observe safety and maintenance instructions on the shielding gas cylinder or the
main gas supply.
-
Close the shielding gas cylinder valve or main gas supply if no welding is taking
place.
-
Check the shielding gas cylinder or main gas supply for uncontrolled gas leakage
before every start-up.
Safety measures
at the installation
location and dur-
ing transport
A device toppling over could easily kill someone. Place the device on a solid, level sur-
face such that it remains stable
-
The maximum permissible tilt angle is 10°.
Special regulations apply in rooms at risk of fire or explosion
-
Observe relevant national and international regulations.
Use internal directives and checks to ensure that the workplace environment is always
clean and clearly laid out.
Only set up and operate the device in accordance with the degree of protection shown
on the rating plate.
When setting up the device, ensure there is an all-round clearance of 0.5 m (1 ft. 7.69
in.) to ensure that cooling air can flow in and out freely.
When transporting the device, observe the relevant national and local guidelines and
accident prevention regulations. This applies especially to guidelines regarding the risks
arising during transport.
Do not lift or transport operational devices. Switch off devices before transport or lifting.
Before transporting the device, allow coolant to drain completely and detach the follow-
ing components:
-
Wirefeeder
-
Wirespool
-
Shielding gas cylinder
After transporting the device, the device must be visually inspected for damage before
commissioning. Any damage must be repaired by trained service technicians before
commissioning the device.
Safety measures
in normal opera-
tion
Only operate the device when all safety devices are fully functional. If the safety devices
are not fully functional, there is a risk of
-
injury or death to the operator or a third party
-
damage to the device and other material assets belonging to the operator
-
inefficient operation of the device
Any safety devices that are not functioning properly must be repaired before switching on
the device.
Never bypass or disable safety devices.
Before switching on the device, ensure that no one is likely to be endangered.
Check the device at least once a week for obvious damage and proper functioning of
safety devices.
Always fasten the shielding gas cylinder securely and remove it beforehand if the device
is to be transported by crane.
13
EN
Summary of Contents for WF 25i Case D200
Page 2: ......
Page 16: ...16...
Page 17: ...General 17...
Page 18: ...18...
Page 22: ...22...
Page 23: ...Controls connections and mechan ical components 23...
Page 24: ...24...
Page 32: ...OPT i WF Stand ard control panel 1 9 8 5 6 10 11 12 2 3 4 7 14 13 32...
Page 37: ...Installation and commissioning 37...
Page 38: ...38...
Page 52: ...52...
Page 53: ...Troubleshooting maintenance and disposal 53...
Page 54: ...54...
Page 61: ...Technical data 61...
Page 62: ...62...
Page 65: ...65 EN...
Page 66: ...66...
Page 67: ...67 EN...