
38
2
-
Feed the AC cable into the inverter, ob-
serving the bending radii specified by
the cable manufacturer
-
Strip sheath from AC cable
-
Strip at least 20 mm of wire from phase
conductors L1 - L3, neutral conductor
N and ground conductor PE
-
Align phase conductors L1 - L3 and
neutral conductor N with the grid
connections according to the phase
-
Push the AC terminal over the phase
conductor, the neutral conductor and
the ground conductor
3
-
Push the AC terminal up and over the
grid connection and the bare end of the
cable
-
Tighten the AC terminal:
5 mm Allen key
Tightening torque = 12 Nm
-
Place the insulation caps onto the grid
connections
-
Repeat the process for phase conduc-
tors L2 and L3 and the neutral conduc-
tor N
4
-
Align the ground conductor PE with the
grounding terminal
-
Push the PE terminal up and over the
grounding terminal and the bare end of
the cable
-
Tighten the PE terminal:
5 mm Allen key
Tightening torque = 12 Nm
2
3
1
3
2
1
4x
L1
L2
L3
N
3
4
Summary of Contents for Agilo 100.0-3
Page 2: ...0...
Page 4: ...2...
Page 8: ...6...
Page 13: ...General information...
Page 14: ......
Page 30: ...28...
Page 31: ...Installation and commissioning...
Page 32: ......
Page 51: ...49 EN 1 2 Inserting the fuse grounds the solar modules on the negative pole 1 1 1 2 2...
Page 53: ...51 EN 2 3 Tightening torque 3 Nm 1 3 2 4 5 4 3 2 4 5 1 5...
Page 57: ...Operation...
Page 58: ......
Page 84: ...82...
Page 85: ...Troubleshooting and maintenance...
Page 86: ......
Page 107: ...Appendix...
Page 108: ......