
61
EN
Fitting metric screw joints to the Fronius String Con-
trol 250/30 DCD DF
General
-
Use the right number of metric screw joints for the available solar module strings. Fit
sealing glands into empty screw joints.
-
Insert the metric screw joints in the following order:
from bottom to top and from left to right.
-
Tighten the metric screw joints and blank screw joints with the tightening torque spec-
ified for their size.
Recommended
order in which to
insert the metric
screw joints
*
As an outlet for the grounding cable only if optional overvoltage protection is used
Fitting metric
screw joints to
the Fronius String
Control 250/30
DCD DF
(1)
Lock nut
(2)
Screw joint
(3)
Strain-relief device
M20
M40
M40
M20*
M25
M32
M32
3
6
1
2
4
5
15
16
10
9
11
13
12
15
24
23
25
21
20
22
7
8
18
19
17
17
17
1
2
Summary of Contents for 250/30 DCD DF
Page 2: ...0 ...
Page 4: ...2 ...
Page 18: ...16 3 4 ...
Page 45: ...43 DE ...
Page 46: ...44 ...
Page 48: ...46 ...
Page 62: ...60 3 4 ...
Page 88: ...86 ...
Page 90: ...88 ...
Page 104: ...102 3 4 ...
Page 131: ...129 FR ...