11
P359mane.fm
7.4
Sealing the straps,
Operation mode Manual
• Press and release immediately the sealing
button
The plastic strap is welded and cut off from the
strap coil at the same time.
The signalisation pin is extended.
After termination of the welding operation, the
welding gripper and the signalisation pin remains
in its position during the cooling down time.
During that time, the tool can not be removed from
the sealed strap.
7.5
Tensioning and sealing the
plastic strap
Operation mode Semi-Automatic
• Push tension button until the adjusted tension
force is reached.
The tensioning operation can be interrupted and
restarted at any time.
After reaching the adjusted strap tension the
sealing cycle is initiated automatically.
• Release the tension button after the sealing
process has been started.
The plastic strap is welded and cut off from the
strap coil at the same time.
The signalisation pin is extended.
After termination of the welding operation, the
welding gripper and the signalisation pin remains
in its position during the cooling down time.
During that time, the tool can not be removed from
the sealed strap.
7.6
Removing the tool
After the expiration of the adjusted cooling time
the welding jaw move upwards.
The signalsiation pin is sunken.
Now the tool can be removed from the strap.
• Pull up the handle lever,
• pull the tool right / backwards and off the
strapping.