
Product Overview
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Page 7
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
B0430408_en
1
Pos
Component
1
P4 Pellet with integrated Pellets cyclone container
2
Lambdatronic P 3100 control system
2.1
Navigation keys to move around in the menus and to change the parameter values
2.2
Status LED (operating status): - slow green flashing light: boiler activated
- fast green flashing light: boiler deactivated
- flashing red light: malfunction
2.3
Large graphical display to show operating statuses and parameters
2.4
Function keys for calling up individual boiler functions or modes directly
3
Ash drawer - heat exchanger
4
Ash drawer - Combustion chamber
5
Ash drawer
6
Ash container - heat exchanger
7
Ash container - combustion chamber
8
Ash screw and stirrer of the automatic heat exchanger cleaning
9
P4 Pellet 32/38: Ash screw and guide plates of the combustion chamber cleaning
P4 Pellet 48/60: Ash screw and stirrer of the combustion chamber cleaning
10
Lever of the ash box lock
11
Service interface of the control
12
Safety temperature limiter - STL
Summary of Contents for P4 Pellet 15
Page 2: ......