2.5.2 General information for installation room (boiler room)
Boiler room characteristics
▪ There must not be a potentially explosive atmosphere in the boiler room as the
boiler is not suitable for use in potentially explosive environments.
▪ The boiler room must be frost-free.
▪ The boiler does not provide any light, so the customer must provide sufficient
lighting in the boiler room in accordance with national workplace design
regulations.
▪ When using the boiler over 2000 metres above sea level you should consult the
manufacturer.
▪ Danger of fire due to flammable materials.
No flammable materials should be stored near the boiler. Flammable objects (e.g.
clothing) must not be put on the boiler to dry.
▪ Damage due to impurities in combustion air.
Do not use any solvents or cleaning agents containing chlorine in the room where
the boiler is installed.
▪ Keep the air suction opening of the boiler free from dust.
Ventilation of the boiler room
Ventilation air for the boiler room should be taken from and expelled directly outside,
and the openings and air ducts should be designed to prevent weather conditions
(foliage, snowdrifts, etc.) from obstructing the air flow.
Unless otherwise specified in the applicable building regulations for the boiler room,
the following standards apply to the design and dimensions of the air ducts:
ÖNORM H 5170 - Construction and fire protection requirements
TRVB H118 - Technical directives on fire protection/prevention
2.5.3 Requirements for central heating water
The following standards and guidelines apply:
Austria:
Germany:
Switzerland:
Italy:
ÖNORM H 5195-1
VDI 2035
SWKI 97-1
D.P.R. no. 412
NOTICE! Note on filling with make-up water: always bleed the filling hose before
connecting, in order to prevent air from entering the system.
Observe the standards and also follow the recommendations below:
❒ Max. cumulative value for alkaline earth: 1.0 mmol/l or 100 mg/l (corresponds to
5.6 dH)
❒ Use softened water as the make-up water
❒ Avoid leaks and use a closed heating system to maintain water quality during
operation
Note on standards
Note on standards
2
Safety
Design information
16
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com