3 Installation
3.1 Unpacking
•
Pull out the nails with which the shell is fastened to the trans-
port pallet. The shell is the wooden box that is situated over
the transport pallet.
•
Lift the shell off the transport pallet.
•
Compare the contents of the delivery with your order.
3.2 Transport
•
Transport with a forklift or elevating truck while on the trans-
port pallet.
•
Use the ring bolt
H
for transport of the cross beater mill.
Do not stand under the transport pallet!
3.3 Setup
•
Lift the cross beater mill off the transport pallet.
Observe the accident prevention guidelines VBG 8, VBG 9a
and VBG 9!
•
Set up the cross beater mill horizontally on a level and stable
indoor surface. It is not necessary to fasten the device in
place.
Operation of the cross beater mill while it is on the transport
pallet is not permitted!
•
Ensure easy access to the cross beater mill.
•
The ambient temperature must range from 5–40 °C.
•
The max. humidity up to 31 °C is 80 % and declines linearly to
50 % at 40 °C.
•
The minimum elevation for setup and use of the device is
200 m below sea level.
3.4 Setup on a laboratory table
You can also mount the cross beater mill onto your laboratory table.
- Measure the laboratory table thickness.
- Use screws with a max. diameter of 8 mm and a length of the
laboratory table thickness plus 25 mm.
- Place the cross beater mill including collecting vessel on the table.
- Mark the hole locations onto the table using the existing holes on
the motor of the cross beater mill.
The spacing from the holes to the front edge of the table must allow
sufficient space for installation and removal of the collecting vessel
and the filter hose.