Fig. 3: Snap fixings
Fig. 4: PC board FC is integrated within the air curtain at delivery
Fig. 6: Hoses are mounted via cable glands at
knockouts to protect the hose and prevent air
leakage.
Fig. 5: Pierce the gland with a screwdriver before
entering the cable.
90°
AR
Service hatch
Service hatch
Arden 4200
8
1
2
PC board FC
Electrical installation
Water connections