Friant FCNAHBC Assembly Instructions Manual Download Page 5

5

Step 9 & 10:

 Ensure the leg assembly is still 

centered, both side-to-side and front-to-back. 
Secure the leg assembly to the worksurface 
with 

N

 (12) truss head screws M5*20mm. 

Secure the side bracket to the worksurface 
with 

N

 12 truss head screws M5*20mm.

Step 9a:

 With option of post foot, as 

shown below:

Step 8:

 Secure 

E

 center rails to 

D

 

crossbeams with 

(8) socket button head 

bolt M6*12mm.

Step 8a:

 With option of post foot, as 

shown below:

Step 11:

  Secure the 

F

 control panel in the 

desired location with 

N

 (2) truss head screws 

M5*20mm. Insert the 

G

 control box in-

between crossbeams.

Step 11a:

 With post foot option as shown 

below:

N

TRUSS HEAD 

SCREWS 

M5*20mm

F

CONTROL 

PANEL

G

CONTROL BOX

L

SOCKET BUTTON

HEAD BOLT

M6*12MM

E

CENTER 

RAILS

N

TRUSS HEAD

SCREWS

M5*20MM

D

CROSS

BEAMS

G

CONTROL 

BOX

M

WIRE 

MANAGER

I

CONNECTOR

WIRES

Step 12:

 Connect 

F

 control panel to 

G

 control 

box with 

I

 connector wires as shown. Use 

M

 

wire manager to secure 

I

 connector wires to 

underside of worksurface.

Step 12a:

 With option of post foot, as 

shown below:

F

CONTROL 

PANEL

Reviews: