Friant FCNAHBC Assembly Instructions Manual Download Page 4

4

K

SOCKET 

BUTTON HEAD 

BOLT M6*20mm

K

SOCKET BUTTON 

HEAD BOLT 

M6*20mm

J

FOOT

O

POST FOOT

Step 6:

 Attach 

J

 feet to 

B

 column leg with 

K

 (4) socket button head bolts, M6*20mm. 

Tighten bolts securely. Repeat step 6 with 
other two legs

Step 6a:

 With option of 

Post foot

: Attach 

O

 

post

 foot to one column leg

 

with 

K

 (4) 

socket button head bolts, M6*20mm. 
Tighten bolts securely. Repeat step 6 
with other two legs

Step 5:

  Remove 

pad after leg installation, then reuse for assembly of other leg(s) 

repeating steps 3 & 4. 

Remove pad when done.

Step 7

:  Place all 3 leg assemblies on worksurface and insert 

E

 center rails into 

D

 

crossbeams as shown. Hole on center rails should be centered between 
crossbeams. Center leg assemblies on the worksurface. Make sure your overhang 
is even on all three sides.

A

B

IMPORTANT:

 Make sure column legs are sitting perfectly flat against the 

worksurface

E

CENTER

RAILS

Base is: 

A

 - 40”-68”

 

B

 - 36”-54”

• 

Maximum recommended top: 54”x78”

• 

Minimum recommended top: 36”x40”

• 

Install My-Hite tops 4” from the back of the base when using 29”+ 
depth tops is recommended.

Step 4:

 Use 

4

 socket button head bolts, M6*12mm to secure side bracket, column leg and 

crossbeam together as shown in detail.

Reviews: