
Installation Manual STG7 P Gas form 9123689 rev. 11/2011
INSTALLATION PROCEDURES
Page 13
MAINTENANCE
The customer should have the gas rotisserie periodically checked by a skilled technician accord
-
ing local, state or national regulations.
First remove the right side panel according the service manual.
•
Check for gas leaks and/or bad connections of the gas supply inside and outside.
•
Check the gas burner.
• Check the inlet pressure and re-adjust if necessary. For the correct value, see table page 8.
• Measure the exhaust gas with a flue gas analyzer, see page 10.
•
Check the electrical supply.