background image

APCO RT Installation

    

           

APCO RT is usually installed on the supply 

side duct just above the air system (upstream 

of a humidifier). It can also be installed on 

the return side if necessary. 
Orient so the air flows past the UV light first 

before the carbon. Position the unit so the 

UV light does not shine directly on non-uv-

resistant materials (filters, humidifiers, flex 

duct, etc.). Ideally the UV light shines on the 

coil.
For dual systems select a remote UV light 

location that shines on the greatest surface 

area or the area with the most microbial 

growth. Refer to the Optional Remote UV 

Light section for installation instructions.

Air Handler

Optional 

2nd UV Lamp

Filter media

Furnace

Optional 

2nd UV 

Lamp

Humidifier

APCO RT in return duct 

with light shining away 

from filter media

Typical Installation Locations

APCO RT Parts List

A

  

Main Unit

B

  

In-D
uc

t A

ir P
uri

f ier

Power Cord (ER Model)

C

  

Duct Mount Plate

D

  

Duct Mount Gasket

Optional 2nd UV Light (Dual)

V

  

PART: 

TUVL-115P

   LIFE: 

1 Year

W

  

PART: 

TUVL-215P

   LIFE: 

2 Year

X

  

WARNING

Panelsticker 

Y

  

WARNING

Sight Glass 

Z

Magnet mount 

Small Parts

E

  

Self-tapping Screws

F

  

Machine Screws  

(for cover) 

G

  

Quick Nut (plastic)

H

  

Tap-in Connector

I

  

Spade Connector

UV Lamps

J

  

PART: TUVL-111   LIFE: 1 Year

K

  

PART: TUVL-211   LIFE: 2 Year

Power Supply

N

  

ER Power Supply

O

  

ST Power Supply

P

  

SI/DI Power Supply

1. Use gasket 

D

 to trace cut-line onto duct. 

2. Cut hole in sheet metal or duct board. 

IMPORTANT!

 

Remove and dispose of 

cut-out piece of material.

3. For sheet metal duct secure mounting plate 

C

 to 

sheet metal ducts using self-tapping screws 

E

.*

4. Remove paper backing from one side of gasket and 

fix gasket to the back of the mounting plate.

5. Remove paper backing from back of gasket then fix 

mounting plate and gasket to the duct.

6. Bend mounting plate flanges around the edges of 

the hole to secure mounting plate. For duct board 

use tape on edges of mounting plate for air leaks 

and additional hold.

1. 

4. 

2. 

5. 

6a. 

6b. 

3. 

STEP 1: APCO RT Duct Mounting

* To install without backing plate use (4) self-tapping screws.

1. Fit the APCO® RT Main Unit through hole in duct. 

If attaching directly to metal duct use (4) Self-

tapping Screws. If the Backing Plate is used fit the 

unit over the threaded posts and use (4) Quick 

Nuts to secure it.

2. Insert UV Lamp.
3. Mount UV Lamp using (2) Quick Nuts and 

attach lamp connector (be sure to align the four 

connector pins).

4. Attach the cover with machine screws.

2. 

3. 

F

G

1. 

STEP 2: APCO RT Power Unit & UV Lamp Mounting

APCO® RT

SI/DI

ST/DT

120-277 VAC

POWER SUPPLY

UV LAMP

4 PIN

CONNECTOR

L1 - BLACK
L2 or N - WHITE

GND - GREEN

Optional 2nd UV Lamp

APCO® RT ER

24 VAC

POWER SUPPLY

UV LAMP

BLACK

4 PIN

CONNECTOR

RED

24 VAC TRANSFORMER

COMMON / BLUE

HOT / RED

STEP 3: Connecting APCO RT to Power

IMPORTANT

Before connecting to power confirm which APCO® RT model is being installed. Turn off main 

power source before installation. Model information is printed on the Power Unit cover.

IMPORTANT! Must be wired to constant power - do not connect to blower relay.

Reviews: