![Fresenius Kabi Agilia SP Technical Manual Download Page 38](http://html.mh-extra.com/html/fresenius-kabi/agilia-sp/agilia-sp_technical-manual_2331626038.webp)
38
6
Maintenance Operations
6.1
Maintenance Options
6.1.1
Accessing the Maintenance Options Menu
6.1.2
Maintenance Date
6.1.3
Initial Set up
1.
Access the
Options
menu. See section 3.3, page 29.
2.
Press the arrow keys to select
Maintenance
.
3.
Press
enter
.
4.
Enter the Maintenance access code.
5.
Press
OK
.
6.
Press the arrow keys to select
Maintenance options
.
7.
Press
enter
.
1.
Access the
Maintenance options
menu. See section 6.1.1, page 38.
2.
Press the arrow keys to select
Svc 1: Maintenance date
.
3.
Press
enter
.
The next scheduled maintenance date is displayed.
4.
Press
exit
to return to the
Maintenance options
menu.
Information
This date corresponds to the next preventive maintenance date to be carried out.
See section 3.2.1, page 28.
The date is displayed for consultation only, and cannot be changed here.
1.
Access the
Maintenance options
menu. See section 6.1.1, page 38.
2.
Press the arrow keys to select
Svc 2: Initial set up
.
3.
Press
enter
.
4.
Select
Yes
using the arrow keys
to ask for the initial configuration to be
loaded at the next pump startup. Otherwise, select
No
.
5.
Press
OK
to confirm the selection.
Summary of Contents for Agilia SP
Page 139: ...139 17 Spare Parts Catalog Refer to the spare parts catalog of the relevant pump ...
Page 143: ...143 VTBI Volume to Be Infused W Watts Term Description ...
Page 147: ...Local Contacts for Servicing Write your contacts here ...
Page 148: ...11378 2_tm_agilia_sp_eng ...
Page 305: ...Local Contacts for Servicing Write your contacts here ...