9
5
5. Insert the Long Cable (40) through the Tower
Frame (1) as shown.
Attach the Connecting Frame (38) to the Tower
Frame (1) with four M10 x 35mm Socket
Screws (71) and four M10 Washers (31).
Start
all four Socket Screws, and then tighten
them.
See step 3.
Tighten the three M10 x 35mm
Socket Screws (71).
6
6. Route the Long Cable (40) upward through the
Small Pulley Bracket (6). Attach the Large
Pulley (24) inside the Small Pulley Bracket with
the M10 x 50mm Socket Bolt (29), the two M10
Washers (31), and the M10 Locknut (32) that
you removed in step 4.
Then, attach the Small Pulley Bracket (6) to the
Tower Frame (1) with the two M10 x 30mm
Socket Screws (30) and the two M10 Washers
(31) that you removed in step 4.
7
7. Identify the Rear Shroud Base (3), which has a
hole in the center, and the Front Shroud Base
(4). Orient the Shroud Bases as shown.
Insert the end of the Long Cable (40) upward
through the Rear Shroud Base (3).
Attach the Shroud Bases (3, 4) to the Tower
Frame (1) with four M6 x 15mm Screws (35)
and four M6 Washers (34).
40
31
1
38
31
71
31
31
31
32
6
1
30
24
40
29
4
1
3
40
34
35
34
35