11
10. Orient the Top Weight (9) and the Drop-down
Weight (10) as shown.
Slide the Top Weight (9), the two Upper Weight
Bumpers (16), the Drop-down Weight (10), and
the two 25mm Snap Rings (39) onto the Weight
Guides (7).
Next, slide the two Weight Guide Bushings (18)
onto the upper ends of the Weight Guides (7).
Attach the two 25mm Snap Rings (39) to the
Weight Guide Bushings (18).
Then, tighten the two M8 x 35mm Set Screws
(19) into the Weight Guide Bushings (18).
11
11. Remove all parts (23, 29, 31, and 32) from the
pulley bracket on the Tower Frame (1).
Route the Long Cable (40) through the pulley
bracket and downward through the hole in the
center of the Tower Frame (1).
Reattach the Small Pulley (23) inside the pulley
bracket with the M10 x 50mm Socket Bolt (29),
the two M10 Washers (31), and the M10
Locknut (32).
Make sure that the Long Cable
(40) is between the Small Pulley and the rod
on the pulley bracket.
10
10
16
9
39
19 18
18
19
29
1
31
23 Rod
31
32
40
7