24
34. Insert a Pulley (46) into the loop of Cable B (64).
Attach the Pulley (46), a Cable Trap (49), and
two Half Guards (47) to the U-bracket (27)
with an M10 x 50mm Bolt (102) and an M10
Locknut (84).
Make sure that the Cable Trap
and the Half Guards are oriented as shown.
35.
See the CABLE DIAGRAMS starting on page
41 to identify the cables.
Locate Cable D (66).
Route Cable D through
the Ab Station Bracket (45).
Insert a Pulley (46) into the Right Upright (2)
under Cable D (66).
Attach the Pulley (46) with an M10 x 115mm Bolt
(97), two M10 Washers (93), two 38mm Spacers
(105), and an M10 Locknut (84).
34
35
47
47
84
27
49
46
64
46
105
84 93
105
45
2
97
93
66
102