INSTALLATION
Typical Installation
2
INSTALLATION
Typical Installation
Risk of damage to pump or other equipment.
•
The motor on this pump is guaranteed by the manufacturer. In event of failure, it must be returned to an authorized product
reseller for review and disposition. Product warranty is void if product is disassembled or reviewed by any other party.
•
Install the pump in a properly developed well. Undeveloped well water often contains abrasives that can damage the pump.
•
Check that the well is deep enough to allow the pump to be set at least 5 ft from the bottom.
•
Do not set pump below the casing perforations or well screen unless there is an adequate flow of water over the motor for cooling
purposes is ensured.
•
Determine the correct pump setting from the driller’s record, taking into account the static water level and the draw-down at the
proposed pumping rate.
Pressure Tank
Pressure Switch
Gate Valve
Service Pipe
Pressure Gauge
Pressure Relief Valve
Spring-Loaded
Check Valve
See Wiring Diagrams
Sanitary Well Seal
or Pitless Adapter
Discharge Pipe
Submersible Cable
Spring-Loaded Check Valve
(Per manufacturer’s recommendation)
Safety Cable
Drop Pipe
Electrical Cable
(secured to drop pipe with tape or clamps every 10ft / 3m)
Well Casing
Spring-Loaded Check Valve at Pump Discharge
Submersible Pump Unit
Suction Screen
Motor
Well Screen or Casing Perforations
Note: Keep pump at least 5 ft from
bottom of well and above well screen
or casing perforations.
Torque Arrestor
Summary of Contents for 3200 Series
Page 22: ...22 REMARQUES ...
Page 23: ...23 REMARQUES ...