EN
7
7
INSTALLATION
Drilling the wall and fixing the brackets
Do the following marking on the wall:
• a horizontal line at minimum 650 mm above the hob.
• As indicated, place the support fixing piece of the hood
7.2
at 338,5 mm above the horizon-
tal reference line.
• Mark the centres of holes in the support.
• Drill ø 8 mm.
• Insert the dowels
11
into the holes.
• Fix the support using the screws
12a
(4,2 x 44,4) supplied.
• Insert and screw two screws
12b
(4,2 x 12,7) (supplied) into the holes for the hood body fix-
ing, placed in the frontal part of the support fixing piece leaving a 5-6 mm distance between
the support and the screw head.
• As indicated, place the upper chimney support
7.4
at the corner of the ceiling.
• Mark the centres of holes in the upper chimney support
7.4
.
• Drill ø 8 mm.
• Insert the dowels
11
into the holes.
• Fix the upper chimney support using the screws
12a
(4,2 x 44,4) supplied.
N.B.
In case of impossibility to install the Upper chimney support
7.4.
to the ceiling, it’s pos-
sible to do that lower, using the 4 Back holes instead of the Uppers.
To install the hood in recycling version it is necessary to follow the instructions described
in the part concerning Recirculation version Air Outlet.
338,5
650 min.
7.2
11
12a
12b
7.4
11
12a
Summary of Contents for FFC 1005 XS
Page 3: ...3 3 SIS LT OHJEET JA SUOSITUKSET 52 MITAT JA OSAT 53 ASENNUS 55 K YTT 58 HUOLTO 59 FI...
Page 6: ...EN 6 6 Dimensions...
Page 14: ...IT 1 14 Ingombro...
Page 22: ...FR 2 22 Encombrement...
Page 30: ...DE 3 30 Platzbedarf...
Page 38: ...TR 3 38 Boyutlar...
Page 46: ...CZ 4 46 Prostorov rozm r...
Page 54: ...FI 5 54 Mitat...
Page 60: ...991 0289 094_ver1 Franke S p a Via Pignolini 2 37019 Peschiera del Garda VR www franke it...