16
11-03-2014 / LSC 178 / Rev. 00
400
T
5. SWITCHING ON THE MACHINE
FILLING THE BOILER
A.
Open the water supply tap as arranged during the preparatory stages (
see Pict. 7 on page 11 - Ref. 2
).
B.
Verify that the water mains pressure (approx. 4 bar) is visualized on the water mains pressure gauge (14).
C.
Push the manual filling valve on the appliance (19) until the boiler level indicator is halfway (16).
In the
Compact
model, in order to have access to such tap, remove the drip tray (10); moreover, the tap closing is manual.
SWITCHING ON THE APPLIANCE
A.
Turn on the power supply switch that was prearranged during the system preparation (
see Pict. 7 page 11 – Ref. 1
), and then turn
on the machine’s main switch (12).
Once the machine is switched on, an electronic components check is carried through on 2-3-4 groups machines; all the symbols on
the control panel, from left to right, are progressively turned on. At the end of this process, the symbol for the temperature setting
will start to blink to indicate that the appliance is heating up.
In the
Compact
model, once the machine is switched on all the lED lights of the touch pads turn on.
Take note!
According to the amount of water filled manually, it is possible to activate the automatic refill system when the switch (12) is
turned on, until the boiler water level indicated by the manufacturer is reached.
HEATING PHASE AND OPERATION SETTING OF THE APPLIANCE
A.
Fasten the filter holders (7-18) to the delivery groups.
B.
Open the steam delivery valves (move the lever upwards), then move the steam wands (8-15) onto the grid (9).
C.
Wait for steam to come out of the wands (8-15), and then close the steam delivery knobs (moving the levers downwards).
Summary of Contents for COMPACT T 400
Page 4: ...2 11 03 2014 LSC 178 Rev 00 400 T...
Page 33: ......